Minimum quantities, sample availability, production dates and packing are confirmed for the selected items and order. Send the same specification to each quoting party, separate confirmed terms from open questions, and agree delivery responsibilities before comparing totals.

Quantities, samples and production dates — AI visualization01

Quantities, samples and production dates

There is no published site-wide minimum order quantity or standard lead time. Ask for the minimum quantity by model and selected configuration, sample or tooling charges, and the proposed production window after approvals. Compare the same item codes, quantities, drawings and materials. Confirm currency, payment milestones, exclusions and quotation validity; distinguish target dates from dates accepted in writing.

Describe packing for the item and route — AI visualization02

Describe packing for the item and route

Ask how finished surfaces, corners, separate tops and loose hardware will be protected through the agreed handling route. Obtain carton/crate counts, packed dimensions and gross weights with units. If tested packing performance is claimed, request the report for the actual item and package configuration.

Name the delivery rule and destination — AI visualization03

Name the delivery rule and destination

Agree on the Incoterms rule, version and named place or port, then confirm the responsibilities it leaves to each party. Resolve insurance, customs documents, unloading, inside delivery and installation with the appropriate providers. For a U.S. destination, ask the importer or broker to review applicable product and wood-packaging requirements before shipment.

Release the shipment with a receiving plan — AI visualization04

Release the shipment with a receiving plan

Match the packing list and carton marks to the approved schedule and drawing revisions. Keep inspection and packing records together. Agree on receiving hours, equipment, component reconciliation and the procedure/deadlines for reporting damage with the supplier and carrier. Do not assume that a marketplace policy covers an off-platform order.

THE PROJECT NOTEBOOK

Agree on the handover, before the order.

Use this checklist with the supplier, freight forwarder, broker and installer. Responsibility and cost allocation must be agreed in the contract.

Agree on the handover, before the order.
StageQuestions to resolveRecord to retain
QuotationWhat is included? Which currency, named delivery rule and named place apply?Dated quotation, exclusions and agreed commercial terms
Packing approvalHow are corners, finished surfaces, loose parts and moisture risks addressed?Packing specification, carton sizes and gross weights
Before collectionDo quantities, item codes, finishes and revisions match the order?Inspection record, packing list and labeled packing photographs
Import and deliveryWho arranges clearance, insurance, unloading and final room placement?Forwarder and broker instructions; access and delivery plan
ReceiptWho checks visible and concealed damage, and how is it reported?Condition photographs and the agreed claims procedure

This checklist is not legal, customs or insurance advice. Confirm destination requirements and project-specific responsibilities with the appropriate professionals.

Resolve the scope before comparing prices.

List the model or category, requested dimensions and quantities, and the question you need answered.

Prepare this project brief

FURNITURE BUYING QUESTIONS

Questions before you specify

Brief answers point to the detailed checks, source boundaries and next step for your furniture request.

What is the minimum order quantity?

There is no published site-wide minimum. Request the minimum quantity for the selected model, configuration and finish. Keep any sample, tooling and packing charges separate in the quotation.

Review quantity and quotation conditions →

How is the production and delivery date confirmed?

Share the target installation date, item quantities, destination and approval needs. Ask which dates are provisional and which are accepted after drawings, samples and materials are resolved. Production time and transit time are separate parts of the schedule.

Plan quantities, approvals and dates →

What do I need for a delivered-price request?

Provide the destination and access requirements as well as the item schedule. Agree the delivery rule, version and named place, then identify who arranges freight, insurance, clearance, unloading, inside delivery and installation. No universal delivered-price or freight offer is published here.

Define the delivery responsibilities →

What packing information should I request?

Request the item-specific protection method, carton or crate count, packed dimensions, gross weights and component labels. Current catalog records do not include confirmed packing specifications. A photograph of protection does not establish tested transit performance.

Build the packing brief →